Is it correct that the construction cost of the design entry is not one of the assessment criteria? Any budget planning /limitation for design reference?

The jury panel will judge the design submission based on the criteria set in Section 9.3 of the competition brief and cost-effective is one of the design requirements. 

# Competition Design Requirement